Errata Sheet and Guidelines for MAX 10 ES Devices

ID 683630
Date 6/12/2015
Public

2.1. Recommended Power-up Sequencing for MAX 10 ES Devices

To ensure the minimum current draw during power up and configuration for MAX® 10 dual supply ES devices, follow the recommended power-up sequence as shown in the figure below.

Figure 3. Recommended Power-up SequenceThe power rails in each group must be ramped up to a minimum of 90% of their full rail before the next group starts.